Running a migration
- ▸Discover → design → pilot → migrate → cutover → hypercare.
- ▸Communication plan beats technical plan — users panic in silence.
- ▸Always have a rollback. Always.
- ▸Cutover at a low-traffic window; hypercare = onsite or always-on for 1–2 weeks.